Modern Systems for Heritage Refurbishment
Though we want to maintain the aesthetics of heritage buildings, that doesn't mean personnel who use or live in them should be without the comfort and efficiency of modern mechanical systems. Bourke Air was commissioned to design, install and maintain mechanical systems as part of a refurbishment of McKillop House in Melbourne's CBD. Our projects team were enthusiastic to rise to the challenge of creating top-quality mechanical systems without disrupting the heritage nature of the building itself.
Case Study
McKillop House
Evaporating the Problem
As an in demand print business, Rapid Labels has massive demand placed on their factories and machines. With overheating a real risk for the technology, and humidity being a real nuisance to any printing practices, temperature control and cooling of their facilities is a must. Cooling was required that could service both large-scale printing machinery, and the entire factory floor itself.
Case Study
Rapid Labels
This 8 level boutique commercial office building consists of basements, end of trip, retail facilities, ground floor lobby with retail tenancies and 8 floors of office space. The building is designed to achieve 5 Star Greenstar and NABERS ratings once operational. We will be working alongside Figurehead constructions for Alfasi properties to deliver this office building.